Skip to content
Three Spheres, A Video Agency

Case study · June 18, 2026

A national deadline that kept moving

Globe had to explain SIM registration to the whole country while the rules were still changing underneath it.

← Behind the Scenes

Every SIM in the Philippines had to be registered before a national deadline, and Globe was carrying the public explanation of how. The subject looked simple. The conditions were not.

The problem was the clock, not the film

Registration ran across several channels, and the details kept moving as the deadline approached. Guidance that was correct on Monday needed re-cutting by Thursday. A standard production rhythm, where a video takes two weeks and a revision takes three days, is not slow in the abstract. It is just useless when the thing being explained changes inside the cycle.

So the real brief was not "make videos about SIM registration". It was "be able to say the current, correct thing, continuously, in public, for months".

What we built instead of a schedule

A small crew who could go out and shoot straightforward interview material at short notice, without a full production mobilising each time.

In the edit suite, a set of templates carrying the campaign look, so a new variant started from a known state rather than from nothing. When only the instruction changed, only the instruction changed.

One dashboard both sides could see, showing what was shot, cut, in review, and approved. Nobody had to ask where anything stood.

The part that actually saved the time

Approvals. A public campaign like this passes several levels of reviewer, and scattered feedback across email threads is where days disappear. Comments came back in one place, against the frame they referred to, so a round closed as one decision rather than as five conversations to reconcile.

Where it landed

The campaign stayed on air through the changes, with turnarounds measured in days rather than weeks, and the public explanation stayed current with the rules it was explaining.

The transferable part is not the templates. It is that when a subject is going to move, you build for revision from the start, instead of treating each change as an exception to a plan that assumed none.

See the work

Work with us

Like how we think? Let's talk about your project.

Get a quote